Bentley WaterGEMS CONNECT Edition Help

Graph Viewer Dialog Box

Using the Graph Viewer dialog box you can view the results of the water quality batch run.



The following controls are available:

Graph Tab  
Export Allows you to export the Graph Image and/or the Graph Data.
Print Prints the current view in the graph display pane.
Print Preview Opens the Print Preview dialog box to view the current image and change the print information.
Activate/Deactivate Zoom Zooms in on a section of the graph. When the tool is toggled on, you can zoom in on any area of the graph by clicking on the chart to the left of the area to be zoomed, holding the mouse button, then dragging the mouse to the right (or the opposite extent of the area to be magnified) and releasing the mouse button when the area to be zoomed has been defined. To zoom back out, click and hold the mouse button, drag the mouse in the opposite direction (right to left), and release the mouse button.
Zoom Extents Zooms out so that the entire graph is displayed.
Refresh Updates the graph to reflect any changes in the underlying data.
Graph Options Allows you to modify the graph settings. See Chart Options Dialog Box for more details.
Bar Chart Displays the graph data as a series of bar charts
Pie Charts Displays the graph data for a selected junction as a series of pie charts. When this button is clicked a menu containing the available junctions will appear, allowing you to select the desired one.
Help Opens the online help.
Time (VCR) Controls Evaluate plots over time. If you click Play, a vertical line moves across the graph and the Time field increments. Click the down arrow button next to the play button to open the Animation Options dialog. If you click Go to Start, the Time resets to zero and the vertical line that marks time resets to the left edge of the Graph display. If you click Step Backwards the time goes back one increment. You can seelct a specific time using the time display pulldown menu. If you click Step Forwards the time moves forward one increment. If you click Go to End, the Time goes to the last time step and the vertical line that marks time resets to the right edge of the Graph display. Change the increment of the animation time step using the right-most menu.
Data Tab  
Data Table

850_GraphDialog_002.bmp

The Data tab displays the data that make up the graphs. If there is more than one item plotted, the data for each plot is provided. You can copy and paste the data from this tab to the clipboard for use in other applications, such as Microsoft Excel. To select an entire column or row, click the column or row heading. To select the entire contents of the Data tab, click the heading cell in the top-left corner of the tab. Use <Ctrl+C> and <Ctrl+V> to paste your data. The column and row headings are not copied.